A log home is a non-stop labor of love, I guess...



2016


  • Put some particle board under the expansion to protect insulation - DONE 1/1/2016
  • Insulate the sub-floor in the crawl space - DONE 1/3/2016
  • Insulate the plumbing in the crawl space - DONE 1/3/2016
  • Never spend two days in the crawl space again... - DONE 1/3/2016
  • Replace the dryer, if only so it matches the new washer - DONE 1/4/2016
  • Reinstall my home's street number - DONE 2/6/2015
  • Plug the holes at the peak of the roof the bats use in the summer time - DONE 2/6/2015 [A bat still got in though...]
  • Refurbish the irrigation system DONE May 2016
  • Replace the scary heater in the bathroom
  • Rebuild the steps from the drive to the lower part of the yard
  • Finish sanding, caulking, and painting the exterior
  • Replace the deck rails DONE July 2016
  • Replace planks as needed and refinish the deck DONE July 2016
  • Rebuild the steps from the back of the deck to the back yard DONE July 2016
  • Have installed a metal roof DONE October 2016

2017 


  • Get some pieces of furniture from the house after it sells NO LONGER NEEDED
  • Buy a garage
  • Remodel bathroom
  • New carpet
  • Expand the flagstone treatment in front of the fireplace